I have received several complaints about construction noise on the Hull Middle School athletic fields last Saturday, March 13th.
Apparently 10 semi-truck trailers started a soil removal operation shortly after 7AM. The City of Torrance Municipal Code does not allow construction to begin until 9AM on Saturday.
I have sent an email to Dr. George Mannon, Superintendent of TUSD, about this incident. Since Hull is not scheduled to open until September 2011, I also asked if overtime was being paid for this Saturday work.
John Bailey, President
SETHA
Apparently 10 semi-truck trailers started a soil removal operation shortly after 7AM. The City of Torrance Municipal Code does not allow construction to begin until 9AM on Saturday.
I have sent an email to Dr. George Mannon, Superintendent of TUSD, about this incident. Since Hull is not scheduled to open until September 2011, I also asked if overtime was being paid for this Saturday work.
John Bailey, President
SETHA
Comments