Skip to main content

Posts

Showing posts from March, 2010

Construction Complaints at Hull Middle School

I have received several complaints about construction noise on the Hull Middle School athletic fields last Saturday, March 13th. Apparently 10 semi-truck trailers started a soil removal operation shortly after 7AM. The City of Torrance Municipal Code does not allow construction to begin until 9AM on Saturday. I have sent an email to Dr. George Mannon, Superintendent of TUSD, about this incident. Since Hull is not scheduled to open until September 2011, I also asked if overtime was being paid for this Saturday work. John Bailey, President SETHA
SETHA will hold a meeting on Wednesday, March 10, 2010, in the John Adams Elementary School Cafeteria, 2121 West 238th Street, Torrance from 7:00PM to 9:00PM. The proposed Rockefeller Group Professional Center project will be presented at the meeting. Representatives from the Rockefeller Group and Sheridan-Ebbert will be available to answer questions about the project. Elections of officers will also be held at the beginning of the meeting. This project is approximately 351,200 square feet of medical/office, professional office and light industrial condominium buildings, to be developed in two phases. The location is at 2740 Lomita Blvd on the vacant lot north of Costco. There will be three two-story medical office buildings, seven two-story professional office buildings and one two-story light industrial building. Approximately 14 acres would be in Phase I and 9 acres in Phase II. Open space around the buildings will include trees, shrubs, groundcover and outdoor seating areas. This v...